StocksMedium•21 October 2026•
4 min read

Lion One posts record gold production of 4,678 ounces in September quarter

By

Key Facts

1Total quarterly gold production reached a record 4,678 ounces.
2Gold recovered from the plant totalled 3,796 ounces during the September quarter.
3Throughput rose 16.5% quarter on quarter, offsetting lower recovery.
4The gold recovery rate was 83.8% during the September quarter.
5Outstanding principal was about US$31.2 million, according to the July financing statement.

Lion One Metals reported record quarterly gold production of 4,678 ounces for the quarter ended September 2026, according to its operating results statement. Gold recovered from the plant totalled 3,796 ounces during the period, compared with 3,291 ounces in the quarter ended June, as processing volumes increased. A drawdown of processing inventory and carbon shipments added 882 ounces to the quarterly total, alongside gold recovered from the plant. The reported record thus included gold recovered during operations as well as contributions from inventory and carbon shipments to overall production. Recovered gold increased despite a decline in the gold recovery rate from the record level set in the previous quarter, as higher throughput offset the drop, the company said.

At the plant, Lion One said throughput rose 16.5% quarter on quarter, with total ore processed reaching 32,588 tonnes during the September quarter. The average plant feed grade held at 4.3 grams of gold per tonne, unchanged from the previous quarter, according to the company's operating figures. The gold recovery rate, meanwhile, was 83.8%, down from 84.9% in the quarter ended June, when the company set its record for this measure. Plant availability was 95.1% during the same period, according to the statement, alongside the increase in processing volumes. The company attributed the offsetting of lower recovery to throughput growth, while the feed grade remained stable between the periods, with higher recovered gold accompanied by increased processing volumes.

At the underground mine, the company completed 1,539 metres of development during the quarter ended September 2026, according to its operating results statement. This work faced equipment constraints, with jumbo drill availability at 59% during the period, affected by breakdowns in September. Those constraints coincided with the announcement that a new underground drill had been delivered, part of the operating update the company presented alongside its recovered gold results. Lion One said the new drill allows for "shorter, faster and less expensive drill holes," describing the capabilities added by the incoming equipment. The drill is being introduced into operations after breakdowns affected jumbo availability, in a quarter that combined continued underground development with equipment constraints.

The results follow a series of processing updates, including Lion One's announcement that commissioning of the new flotation plant at Tuvatu had been completed. The company said at the time: "Commissioning confirms that the plant operates, but it does not mean that the plant is yet operating at full capacity or full efficiency." Under a separate plan announced in July 2026, the company began a filtration expansion that includes upgrading the filter press to increase the plant's nameplate capacity. The plan aims to raise that capacity from 300 tonnes per day to 400 tonnes per day upon completion, according to the company's project statement. Lion One estimated the capital expenditure required for the filtration expansion at about C$1.9 million, as part of the announced plan to increase the plant's processing capacity.

On the financial side, outstanding principal was about US$31.2 million, according to Lion One's July 2026 financing agreement statement. In that statement, the company announced that financial and non-financial loan defaults had been cured, alongside an agreement with the lender to extend the repayment deadline. Describing the status of its contractual obligations, it said "financial and non-financial defaults have been cured," according to its financing agreement announcement. The agreement included an extension of the deadline to repay the first tranche, as part of the arrangements announced with the senior lender in July. In share trading, LOMLF closed at US$0.11726 per share on 20 October 2026, according to EL7 data, ahead of the upcoming events on the company's calendar.

Lion One's upcoming schedule includes the Red Cloud mining conference in Toronto, scheduled for 28 and 29 October 2026, according to the company's investor events page. The conference follows the share's recorded October close and precedes the extended deadline to repay the first debt tranche under the July agreement. That agreement set 31 December 2026 as the repayment deadline following the extension announced in the company's financing statement. On the operating side, Lion One is targeting completion of the filtration expansion by the end of the first quarter of 2027, according to the target schedule in the project announcement. That date relates to completion of the expansion announced in July, which aims to increase the plant's nameplate capacity by upgrading the filtration system.