•Sean Duffy’s letter covered Ford’s ties with CATL, Geely and BYD, while the unacceptable-dependence description specifically concerned continued Lincoln Nautilus production in China before 2030.
•Ford announced in 2023 a $3.5 billion LFP battery plant with about 35 gigawatt-hours of annual capacity using CATL knowledge and services.
•Ford’s stake in the Geely venture is 66% versus Geely’s 34%, with operations targeted for the first half of 2027 and production in 2028.