ResolvedStocks

West Red Lake Gold Reports High-Grade Drill Results at Madsen Mine

First Detected: Jul 7, 2026, 8:45 AM
Last Update: 4 months ago
4 updates

Event Summary

West Red Lake Gold reported high-grade drill results at the Madsen Mine, featuring 43.38 g/t Au over 3.85m, while Osisko Development announced extended gold mineralization at the Cariboo Project beyond 700m depth. In the digital asset sector, Bitfufu produced 125 BTC in June, showing a decrease in daily average production compared to May. Additionally, the company's total power capacity under management dropped to 273 MW from the previous month's 346 MW.

Timeline

  1. Jul 12, 2026, 8:30 AM
    Bitfufu Bitcoin Production Drops 29% in June Amid Capacity Contraction

    The company produced 125 BTC in June with a daily average of 4.2 BTC, driven by a significant reduction in total managed power capacity.

  2. Jul 8, 2026, 9:15 PM
    Osisko Development Extends Gold Mineralization at Cariboo Project

    The miner reported high-grade drill results extending gold mineralization beyond 700 meters vertical depth in previously untested zones.

  3. Jul 7, 2026, 8:30 AM
    West Red Lake Gold Reports High-Grade Drill Results at Madsen Mine

    The company reported gold grades of up to 43.38 g/t, supporting potential restart and expansion plans at the Canadian mine site.