30%
of Amazon and Generac's 8 billion deal cap actually contracted
EL7 Research · Energy
17 September 2026
In nine days Amazon used the same instrument twice — for chips with Qualcomm and for power with Generac — and in both cases the headline figure was a cap on the vesting of a right to buy shares, not an order book. This guide explains the data-centre power industry from first principles — what a centre physically consumes, the power chain piece by piece, and why a transformer is ordered three years before installation — then scores forty-four names using the EL7 operating score.